06-05-2025
Computer:
Today it is two twenty in the afternoon. I am on another BASEcamp meeting listening to a bald guy in what looks to be his fifties talk about Identity and Access Management.
This morning I woke up at six twenty, took my antidepressant and stimulants, drank an espresso on top of it, and drove to the Target one town over to try to get the new Nintendo system – the Switch 2.
I knew I was in good shape pretty much immediately. There were only ten or fifteen people waiting for the place to open. I figured they'd get at least twenty five systems and I'd be able to snag something. So I got my spot in line and waited for twenty minutes in the early morning sun, comfortable and confident. Struck up a conversation with the woman who got a spot behind me – an overweight nerd who looked to be about my age, closing in on fifty, graying hair, but a happy face somehow. She was married, had a kid around ten, said she was getting it for her kiddo but she played too. Zelda, metroid - she knew all of this stuff in a fair amount of detail. Complained about the motion controls in Skyward Sword and revealed that it was the one Zelda she couldn't finish. Mentioned that Nintendo never seems to release enough product, and I agreed – they try to keep up artificial demand. I was glad to talk to her, it made the time pass a little faster.
And before I knew it, I had it. We moved inside, two guys in the electronics section manned the register, one dealing out stock, the other ringing people up. I got the non-mario-kart bundle because I don't care much for that particular game – total 483. Stopped by Stop and Shop on the way back to grab a few things that Maeve wanted: Salad stuff, fruit, eggs. Home at seven forty five, woke up my dumb dog, went for a quick walk, then back home. Played with the doggo while Maeve finished getting ready for work. After she left I did the usual: Smoked a cigarette outside, let our dog mess around on the carpet. I took a picture of the switch and sent it to my friend Brian, made him jealous. He may end up getting a Switch after all – he wasn't sure before, but it looks as though I managed to make him jealous enough to go and pick one up. I set it up, removed drawers from the entertainment console so I could plug things in and do the wiring, put the drawers back, grease stains on my hands from the rails. The last time I removed these drawers I had a back flare-up that made me pant and sweat, the pain of it. This time it was difficult but easier than before. I secured the power cables to the wall behind the drawer and made sure they closed cleanly. I set up the HDMI interface. I booted the system and did the initial setup: Wireless, account login. I installed Zelda: Tears of the Kingdom and then did more account stuff so I could log into the eShop and download the TOTK “Switch 2” expansion / graphics pack. Presto: The game now runs at 60fps and looks incredible. I still have to move over save files because I'm pretty sure I don't want to go through the whole game again.
By the time this was all done it was ten AM and I was able to crate Shelley. I decided fuck it, let's go into the attic and do ductwork. I secured the zone 3 output using zip ties and wrapped some fiberglass bat around it for an additional layer of insulation, then wrapped that in plastic from a garbage bag, then did my best to air-seal it all together using HardCast mastic tape. It had to be a hundred degrees in the attic even though it was morning. I wore boxers only, my chest bare and glistening from sweat, peeling off sections of tape from the roll, removing the backing, sealing, sealing, sealing. I drank coke zero because I bought a liter of it – I normally don't drink soda but I wanted to have it included in the picture of me with my switch 2 that I sent to Brian, because Brian's Language of Jealousy is all about indulgence. He likes Coke Zero, so that's what I bought.
Anyway Zone 3 is done. I moved back to Zone 2 and tried to mastic around it. I decided to remove the damper entirely on the route to the register in my office because I couldn't fix it. I tried to imagine a scenario where I want to heat and cool zone 2 but wanted reduced flow to my office and couldn't really come up with anything. It might as well get full flow, always. Who cares. After sealing the opening with plumber's putty and more mastic, I re-attached the flex duct, zip lined it tight, mastic'ed it to the metal opening. By this point it was twelve thirty. I had my work meeting in the background, people talking about identity management, and felt bad that I wasn't paying full attention. I'm in my office now and I wish I could run the AC here because it's fucking ninety five degrees outside but all the sealant shit I used upstairs needs to cure for a bit before I start everything up in that zone. Although at these temperatures, I might be able to do it in another hour or so. Once these work meetings are over I could duck up there and check. If it's dry and cured, I might just go ahead and turn it on, see what happens.
Then what I have left is applying the flex-foil to the ductwork where I'd removed the old insulation. it needs to be airtight around the duct or there could be moisture issues – humid air will produce condensation against the duct if there is any flow at all. I'll do my best. I don't know if I have enough flex-foil to do the whole thing. Then I'll finish wrapping the flex duct that leads to my office. This will mean more zip lining, some usage of the extra insulation I brought upstairs, maybe another plastic-wrap, like I did with the zone 3 duct. Probably two more hours of work. I could do it today but I probably shouldn't – it is going to be an absolute furnace up there. It would be saner to do it tomorrow morning, let myself relax today. Maybe go to home depot and buy unfaced insulation bats to bring upstairs to wrap around the rest of the duct. I'm not totally sure that I'm going to do this yet. it's a lot of extra work and probably another hundred bucks of material. But it might also be worth it. I can feel the coolness of the ducts that only have the foil on them and feel that the extra wrap will help to really keep them tight – a particular concern when I am running this thing constantly, which I will be. Did I mention it's 95 degrees today? On June 5th for fucks sake. Anyone who doesn't think climate change is real can suck my balls.
So the better plan may be to go to home depot and buy a bunch of insulation and prep for tomorrow. I'm almost done with this fucking project. I thought I'd be done last week but no. It just goes on and on. It's time to finish up. I'm sick of it.